MAY 2024
Tower crane has been installed and Basement Level 2 concrete slab is poured and 80% complete. Formwork for Basement Level 1 is being prepared and ready for the concrete slab to be poured.
NOV 2023
Completing the design phase for 333 StK in collaboration with Rothelowman Architects at the display suite.